MARINE AGENDA – UHH Team - Year 2, Quarter 1 (Sep-Nov, 2010) Field Trip Summaries

Jan 27 2011 2:09 pm

Sept 26th, 2010
Site: Kiholo
Crew: Erik Johnson and Judy Walker, plus one Keaholoa volunteer
Met Keaholoa team, kayaked surface map using YSI 6600 V2, collected 10 water samples, collected 2 additional samples from anchialine ponds. 4 primary productivity/ respiration samples taken. Water sample nutrient analyses conducted. Flow cytometry and Chl a analyses.

Oct. 24th, 2010
Site: Kiholo
Crew: Erik and Kristine Johnson
Met Keaholoa, kayaked surface map using YSI 6600 V2, collected 6 surface samples for metabolism. Water sample nutrient analyses conducted.



MARINE AGENDA – UHH Team - Year 2, Quarter 1 (Sep-Nov, 2010)

Jan 27 2011 2:05 pm

UHH marine team conducted two sampling trips to Kiholo (Sept 26, Oct 24, 2010) and two sampling trips to Kaloko (Oct. 29-31; Nov 21, 2010). Deployed 19 benthic water temperature loggers at Kaloko (Oct. 29-31).
Kiholo: Surface mapping completed both dates; 10 surface water samples (+nutrient analysis) + 2 anchialine pond; 10 primary productivity/respiration/metabolism samples
Kaloko: Surface mapping (Nov 21); 6 surface water samples (+nutrient analysis); 18 benthic water samples (+nutrient analysis); 13 benthic characterization samples; 17 fish assemblage samples



ENDER TEAM LEADS – Year 2, Quarter 1 (Sep-Nov, 2010)

Jan 27 2011 1:55 pm

Provided slides and information for Reverse Site Visit. No Team Lead attended.
Completed Carry-over fund budget.
Attended State-wide Conference, Oct 8-9, 2010 (JB, TG, BO).
Bi-weekly ENDER meetings.



ENDER TEAM UPDATE - 2 DEC 2010

Dec 2 2010 1:57 pm

Year 2 budgets were completed in Oct (FY for grant [cooperative agreement]: Sep 1 - Aug 31)
Year 2 equipment - PO pending; YR 1 equipment rec'd; Boat should be shipped in Feb; Satlantic Buoy ordered
Plan for Carryover Funds from YR 1 (Unobligated Funds Spending Plan) completed.

JB- 2 Dec 2010